Por favor, use este identificador para citar o enlazar este ítem:
https://doi.org/10.1002/adma.201302031
![](/digitum/image/email_logo.png)
![](/digitum/image/logo-facebook.png)
Registro completo de metadatos
Campo DC | Valor | Lengua/Idioma |
---|---|---|
dc.contributor.author | Krebs, Frederik C | - |
dc.contributor.author | Espinosa, Nieves | - |
dc.contributor.author | Hösel, Markus | - |
dc.contributor.author | Søndergaard, Roar | - |
dc.contributor.author | Jørgensen, Mikkel | - |
dc.contributor.other | Facultades, Departamentos, Servicios y Escuelas::Departamentos de la UMU::Física | - |
dc.date.accessioned | 2024-02-08T12:16:36Z | - |
dc.date.available | 2024-02-08T12:16:36Z | - |
dc.date.issued | 2014 | - |
dc.identifier.citation | Advanced Materials 2014, 26, 29–39 | - |
dc.identifier.issn | Print: 0935-9648 | - |
dc.identifier.issn | Electronic: 1521-4095 | - |
dc.identifier.uri | http://hdl.handle.net/10201/139002 | - |
dc.description | Acceso restringido | - |
dc.description.abstract | A solar park based on polymer solar cells is described and analyzed with respect to performance, practicality, installation speed, and energy payback time. It is found that a high voltage installation where solar cells are all printed in series enables an installation rate in Watts installed per minute that far exceed any other PV technology in existence. The energy payback time for the practical installation of polymer solar cell foil on a wooden 250 square meter platform in its present form is 277 days when operated in Denmark and 180 days when operated in southern Spain. The installation and de-installation rate is above 100 m min −1 , which, with the present performance and web width, implies installation of >200 W min −1 . In comparison, this also exceeds the overall manufacturing speed of the polymer solar cell foil with a width of 305 mm which is currently 1 m min −1 for complete encapsulated and tested foil. It is also signifi cant that simultaneous installation and de-installation which enables effi cient schemes for decommissioning and recycling is possible. It is highlighted where research efforts should most rationally be invested in order to make grid electricity from OPV a reality (and it is within reach). | en |
dc.format | application/pdf | es |
dc.format.extent | 11 | - |
dc.language | eng | es |
dc.publisher | Wiley | - |
dc.relation | This research was supported by the Danish Ministry of Science, Innovation and Higher Education through the EliteForsk initiative, through the 2011 Grundfos Award and Energinet.dk (project no. 10728) | es |
dc.rights | info:eu-repo/semantics/embargoedAccess | es |
dc.title | 25th anniversary article: Rise to power - OPV-based solar parks | es |
dc.type | info:eu-repo/semantics/article | es |
dc.embargo.terms | Si | - |
dc.identifier.doi | https://doi.org/10.1002/adma.201302031 | - |
Aparece en las colecciones: | Artículos: Física |
Ficheros en este ítem:
Fichero | Descripción | Tamaño | Formato | |
---|---|---|---|---|
2013 Rise to Power OPV Based Solar Parks.pdf | 1,61 MB | Adobe PDF | ![]() Visualizar/Abrir Solicitar una copia |
Los ítems de Digitum están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.